Is it possible to test multi-base simultaneously in one application.
log in

Advanced search

Message boards : Number crunching : Is it possible to test multi-base simultaneously in one application.

Author Message
wwwwww
Send message
Joined: 27 Feb 17
Posts: 9
Credit: 19,219,486
RAC: 1,853
Message 4273 - Posted: 16 Mar 2018, 23:36:57 UTC

If so, it will be very interesting to see many single k base with low test range tested to higher value in short time, and possibly proof some of the base. It should not be more work than some 100 k base test in 100k-250k range, but much more interesting. I see that many of those base are already sieve and should be ready to be tested.

Profile rebirther
Volunteer moderator
Project administrator
Project developer
Project tester
Project scientist
Avatar
Send message
Joined: 2 Jan 13
Posts: 7227
Credit: 42,729,227
RAC: 34
Message 4274 - Posted: 17 Mar 2018, 0:39:28 UTC - in response to Message 4273.

If so, it will be very interesting to see many single k base with low test range tested to higher value in short time, and possibly proof some of the base. It should not be more work than some 100 k base test in 100k-250k range, but much more interesting. I see that many of those base are already sieve and should be ready to be tested.


Yes I know, but with the current config its too much work.

[SG]Felix
Avatar
Send message
Joined: 25 Dec 17
Posts: 63
Credit: 21,692,929
RAC: 9
Message 4389 - Posted: 29 May 2018, 11:14:56 UTC

whats the problem with modifying the current config?

Profile rebirther
Volunteer moderator
Project administrator
Project developer
Project tester
Project scientist
Avatar
Send message
Joined: 2 Jan 13
Posts: 7227
Credit: 42,729,227
RAC: 34
Message 4390 - Posted: 29 May 2018, 18:15:16 UTC - in response to Message 4389.

whats the problem with modifying the current config?


There is a lot of manual effort to copy/paste/check multiple bases in one folder. Its also not good if I do some backup of the folder / run the script.

[SG]Felix
Avatar
Send message
Joined: 25 Dec 17
Posts: 63
Credit: 21,692,929
RAC: 9
Message 4391 - Posted: 29 May 2018, 20:49:40 UTC

ah okay thanks


Post to thread

Message boards : Number crunching : Is it possible to test multi-base simultaneously in one application.


Main page · Your account · Message boards


Copyright © 2014-2024 BOINC Confederation / rebirther